Skip to content
24/7 EmergencyPune HQ · Fire safety products & services across India since 2008

Fire Safety Audit for Factories & MIDC Units

Production can’t stop, but a fire will stop it for months. We audit your plant, stores and utilities, give you a prioritised action list and help you close it without disrupting shifts.

FIRENET engineers inspecting an industrial unit in a MIDC area
🏛️Licensed AgencyMaharashtra Fire Services
🧾Form A & Form BIssued only after inspection & testing
📑Written reportPhotos, risk rating & action plan
📅Since 2008Pune, PCMC & MIDC belts

Industrial fires start small and grow fast

Most factory fires start with something ordinary — an overloaded panel, a hot-work job, oily waste, or packaging stacked too close to a heat source. Warehouses add high racks and large stocks of combustible material. A fire audit finds these risks before they cause a shutdown, an injury or an insurance dispute.

Industrial and storage buildings are covered by the Maharashtra Fire Prevention and Life Safety Measures Act, 2006. Covered units must keep fire systems in working order and submit a maintenance certificate from a Licensed Agency twice a year (Form B); new installations need a compliance certificate (Form A). The Factories Act, 1948 also requires fire precautions in factories. FIRENET covers Pune, PCMC and the MIDC belts of Bhosari, Chakan, Talegaon and Ranjangaon.

Sites we audit

  • Engineering, automotive and fabrication plants
  • Pharma, chemical and paint units
  • Food and FMCG plants
  • Warehouses and logistics parks
  • Plastics, packaging and printing units

What We Check in Factories & MIDC

🚒

Hydrant & sprinklers

Ring main pressure, hydrant valves, hoses, sprinkler coverage above racks and after layout changes.

⚙️

Pump house

Electric, diesel and jockey pumps on auto, fuel level, batteries, and a test start.

📦

Storage & racks

Clearance below sprinklers, aisle widths, stacking height and segregation of flammables.

⚡

Electrical & utilities

Panels, cable trays, transformers, DG sets, compressors and boiler areas.

🔥

Hot work & processes

Permit systems, welding areas, ovens, dryers, dust and solvent handling.

👷

Emergency response

Fire team, alarms across the plant, assembly points and drill records per shift.

What Audits Commonly Find in Factories & MIDC

Typical examples of gaps found in audits of similar buildings — not a specific client. Your report lists what we actually find at your site, with photos.

AreaTypical findingWhy it matters
WarehouseStock stacked up to the sprinkler headsSprinklers can’t control the fire
Pump houseDiesel pump battery flat; pumps on manualNo water when needed
Hydrant ringHose boxes empty or used for storageDelay in firefighting
ElectricalLoose cable terminations, missing panel coversArcing and fire
FlammablesSolvents kept in the production areaRapid fire spread
Shift teamsNight shift not trained or drilledSlow response

From Site Visit to Certificate

1

Free site visit & scope

We walk the building with you, agree the scope and share a written quote.

2

Document review

Fire approval / NOC, drawings, previous Form B, service reports and drill records.

3

Inspection & testing

Every floor, basement, terrace and plant room — systems tested where safe to do so.

4

Report with priorities

Photos, risk rating (high / medium / low) and practical fixes, usually within 3 working days.

5

Repairs & certificate

We fix what is needed, re-test and issue Form B (or Form A for new installations).

Free download · PDF

Fire Safety Audit Checklist

A practical, room-by-room checklist used by our auditors — so you can check your own building before an audit or a Form B inspection.

  • Extinguishers, hose reels, hydrants and sprinklers
  • Pump room, fire alarm and emergency lighting
  • Escape routes, refuge areas and signage
  • Electrical risks, storage and housekeeping
  • Documents: Form A, Form B, service reports and drills

See everything the free audit checklist covers →

Get the checklist

Enter your details and the PDF downloads straight away.

We may call or WhatsApp you once about fire safety for your building. No spam.

Frequently Asked Questions

Do factories in MIDC need Form B? +

Industrial buildings covered by the Maharashtra Fire Prevention and Life Safety Measures Act, 2006 must submit a maintenance certificate from a Licensed Agency twice a year. Units in MIDC areas deal with the fire authority notified for that area — we help you confirm which applies to your plant.

Can the audit be done without stopping production? +

Yes. Inspections are planned around your shifts. Tests that need a shutdown — for example pump or hydrant flow tests — are scheduled with your maintenance team.

Does the report help with insurance? +

Yes. The report lists each risk with photographs and recommended actions. Insurers and corporate EHS audits often ask for this kind of documented evidence.

Can you design and install missing systems? +

Yes. FIRENET designs, installs and commissions hydrant, sprinkler, alarm and suppression systems, and issues Form A on completion.

Recent projects

Our Work for Factories

Fire safety projects FIRENET has completed for similar buildings.

Industrial

Automotive Parts Factory

📍 Chakan MIDC, Pune

High-sensitivity fire detection for paint shop, foam suppression for electrical room, and full hydrant network. Factory occupancy certificate achieved.

See all projects →

Fire audit for factories & MIDC in Pune

Free site visit and written quote from a Maharashtra Fire Services Licensed Agency.