Skip to content
24/7 EmergencyPune HQ · Fire safety products & services across India since 2008

Form A Compliance Certificate in Pune

For new buildings, extensions and new fire installations: we test the complete system against the requirements and, as a Licensed Agency, issue Form A for your fire approval file.

FIRENET engineer with a Form A inspection checklist in a fire pump room
🏛️Licensed AgencyMaharashtra Fire Services
🧾Form A & Form BIssued only after inspection & testing
📑Written reportPhotos, risk rating & action plan
📅Since 2008Pune, PCMC & MIDC belts

What is Form A?

Form A is the fire safety compliance certificate. Under Section 3(3) of the Maharashtra Fire Prevention and Life Safety Measures Act, 2006, the owner or occupier furnishes to the Chief Fire Officer or nominated officer a certificate from a Licensed Agency regarding compliance with the fire prevention and life safety measures. The Rules call this Form A.

It matters most at completion: Section 3(2) says the planning authority should not issue a completion certificate unless it is satisfied that the owner has complied with the requirements in Schedule I of the Act. FIRENET designs and installs fire systems, and as a Licensed Agency can test and certify installations — including systems installed by other contractors.

When Form A is usually needed

  • New residential, commercial or institutional buildings before occupancy
  • New factories, warehouses and plant expansions
  • Extensions or new floors with new fire installations
  • When fire systems are installed or upgraded as required by the fire authority

How Form A differs from Form B and the Fire NOC is explained in our guide Form A vs Form B vs Fire NOC.

Checked and tested before we sign

🚒

Hydrant & riser

Pressure test, landing valves, hose boxes and fire brigade inlet.

💧

Sprinklers

Coverage, installation valve, flow and alarm tests.

⚙️

Pump room

Main, jockey and diesel pumps — automatic start and performance.

🔔

Detection & alarm

Detector layout, panel programming, cause-and-effect and PA.

🧯

Portable equipment

Extinguishers and hose reels of the right type in the right places.

🚪

Escape provisions

Exit signs, emergency lighting, refuge areas and fire doors.

Design, install, test and certify — one team

Most delays at completion come from gaps found late: a pump that does not start automatically, a riser that fails the pressure test, or detectors that do not match the drawings. When FIRENET handles the fire safety project end to end, testing and Form A are planned from day one.

If your building already has an installation, we inspect and test it as it is, give you a clear gap list and certify once it complies.

The Form A Certificate process

1

Drawings & requirements

We review the approved fire drawings and the requirements for your building type and height.

2

Installation or inspection

FIRENET installs the systems, or inspects an installation done by others.

3

Testing & commissioning

Hydrant and riser pressure, sprinkler flow, pump auto-start, alarm cause-and-effect.

4

Gap list

Anything that does not meet the requirement is listed and fixed.

5

Form A issued

Certificate with test records for your fire approval file.

6

Handover & maintenance

Training for your team and a plan for twice-yearly Form B.

Free download · PDF

Fire Safety Audit Checklist

A practical, room-by-room checklist used by our auditors — so you can check your own building before an audit or a Form B inspection.

  • Extinguishers, hose reels, hydrants and sprinklers
  • Pump room, fire alarm and emergency lighting
  • Escape routes, refuge areas and signage
  • Electrical risks, storage and housekeeping
  • Documents: Form A, Form B, service reports and drills

See everything the free audit checklist covers →

Get the checklist

Enter your details and the PDF downloads straight away.

We may call or WhatsApp you once about fire safety for your building. No spam.

Frequently Asked Questions

What is Form A? +

Form A is the certificate a Licensed Agency issues confirming that the fire prevention and life safety measures required for a building have been provided — typically after the fire fighting installations in a new building or extension are completed and tested.

When do we need Form A? +

Usually before occupancy: the Act says the planning authority should not issue a completion certificate unless the owner has complied with the fire safety requirements in Schedule I. Form A is the Licensed Agency’s certificate of that compliance.

Can you issue Form A if another contractor installed the system? +

Yes, after we inspect and test the complete installation against the approved drawings and requirements. Any gaps are listed and must be fixed before we certify.

What tests do you do before Form A? +

Typically hydrant and riser pressure tests, sprinkler flow tests, pump automatic start and performance, fire alarm cause-and-effect, and checks of extinguishers, signage and emergency lighting.

What comes after Form A? +

Once the building is occupied, the fire systems must be maintained and a Form B maintenance certificate submitted twice a year, in January and July.

Get your Form A Certificate from a Licensed Agency

Inspection, testing, repairs and certificate — handled by one team in Pune, PCMC and the MIDC belts.